Business Header Graphic

General Rules and Specifications (GRS)

Spec. 1-16 PDF Icon Location of non-oil filled electrical equipment

Spec. 1-17 PDF Icon Location of oil filled pad-mounted equipment (1 of 2)

Spec. 1-17 PDF Icon Location of oil filled pad-mounted equipment (2 of 2)

Spec. 1-19 PDF Icon General clearance for pad-mounted switchgear

Spec. 1-20 PDF Icon Installation procedure for protective bollards used with pad-mounted equipment

Spec. 1-23 PDF Icon Clearance required at swimming areas, fountains and similar installations

Spec. 1-43 PDF Icon Trenching for underground cables

Spec. 1-44 PDF Icon URD layouts

Spec. 1-45 PDF Icon Subdivision staking requirements for all Tampa Electric equipment in easements

Spec. 1-46 PDF Icon Staking requirements for apartments and zero lot line applications

Spec. 1-47 PDF Icon Site preparation, three-phase pad-mount transformer installation

Spec. 1-48 PDF Icon Site preparation, single-phase pad-mount transformer installation

Spec. 6-1 PDF Icon Poured in place concrete pullbox and handhole design

Spec. 6-2 PDF Icon "S" Type precast manhole 8' X 12' X 7' (1 of 2)

Spec. 6-2 PDF Icon "S" Type precast manhole 8' X 12' X 7' (2 of 2)

Spec. 6-3 PDF Icon Precast 5' X 10' - 6" X 7' concrete pullbox/splicebox (1 of 2)

Spec. 6-3 PDF Icon Precast 5' X 10' - 6" X 7' concrete pullbox/splicebox and accessories (2 of 2)

Spec. 6-4 PDF Icon Precast 6' X 12' X 7' concrete pullbox/splicebox (1 of 2)

Spec. 6-4 PDF Icon Precast 6' X 12' X 7' concrete pullbox/splicebox and accessories (2 of 2)

Spec. 6-5 PDF Icon Precast 4' - 4" X 13' - 4" X 6' - 0" concrete pullbox/splicebox (1 of 2)

Spec. 6-5 PDF Icon Precast 4' - 4" X 13' - 4" X 6' - 0" concrete pullbox/splicebox and accessories (2 of 2)

Spec. 6-7 PDF Icon Polymer concrete pullbox 30" X 60" X 48"

Spec. 6-8 PDF Icon Precast 10' - 0" X 8' - 6" X 7'- 0" T-type manhole

Spec. 6-9 PDF Icon Precast manhole 10' X 10' X 7' (1 of 2)

Spec. 6-9 PDF Icon Precast manhole 10' X 10' X 7' (2 of 2)

Spec. 6-11 PDF Icon Pad design for single-phase pad-mounted transformers

Spec. 6-12 PDF Icon Pad design for three-phase pad-mounted transformers

Spec. 6-18 PDF Icon Conduit/pad details - 600 AMP - P.S.E. multi-compartment gang-operated

Spec. 6-20 PDF Icon Pad detail for pad-mounted secondary termination cabinet

Spec. 6-21 PDF Icon Splicebox/light traffic handhole 30" X 48" X 18"

Spec. 7-16 PDF Icon Conduit detail for three-phase pad-mounted transformer

Spec. 7-26 PDF Icon Requirements for single-phase UD pad-mounted transformer installations

Spec. 7-56 PDF Icon Installation procedure for protective bollards used with pad-mounted equipment

Spec. 11-2 PDF Icon Secondary connectors single-phase URD pad-mount transformer

Spec. 12-26 PDF Icon Pad-mounted secondary cabinet (1 of 3)

Spec. 12-26 PDF Icon Pad-mounted secondary cabinet (2 of 3)

Spec. 12-26 PDF Icon Pad-mounted secondary cabinet (3 of 3)

Spec. 13-17 PDF Icon Minimum space requirements for flammable liquid filled pad-mounted transformer in indoor vault

Spec. 13-21 PDF Icon Minimum space requirements for 600 AMP auto-throwover pad-mounted switching equipment (PSE) on grade indoor vault (1 of 2)

Spec. 13-21 PDF Icon Minimum space requirements for 600 AMP auto-throwover pad-mounted switching equipment (PSE) on grade indoor vault (2 of 2)

Spec. 13-23 PDF Icon Typical pit and conduit detail for 600 AMP manual and auto-throwover pad-mounted switching equipment vault (1 of 3)

Spec. 13-23 PDF Icon Typical pit and conduit detail for 600 AMP manual and auto-throwover pad-mounted switching equipment vault (2 of 3)

Spec. 13-23 PDF Icon Typical frame & cover details 600 AMP manual and auto-throwover pit area (3 of 3)

Spec. 13-25 PDF Icon Typical space and installation requirements for metering cabinets

Spec. 13-27 PDF Icon Vault space requirements for metal enclosed switchgear

Spec. 13-29 PDF Icon Typical conduit details pad-mount transformer in indoor vault

Call before you dig

Every digging project, no matter how large or small, requires a call to 811. View the color code for marking underground utility lines.
811 Sunshine Logo

Questions about your construction project?

Call Tampa Electric's Construction Team at 813-635-1500.

Our Project Managers are ready to assist you with your construction project.

Pay Construction Costs

Payment may be made by check or money order

Please submit to:
Tampa Electric
c/o ED Billing
PO Box 173169
Tampa, FL 33672

Call Before You Dig Color Codes ×