Spec. 1-16 Location of non-oil filled electrical equipment
Spec. 1-17 Location of oil filled pad-mounted equipment (1 of 2)
Spec. 1-17 Location of oil filled pad-mounted equipment (2 of 2)
Spec. 1-19 General clearance for pad-mounted switchgear
Spec. 1-20 Installation procedure for protective bollards used with pad-mounted equipment
Spec. 1-23 Clearance required at swimming areas, fountains and similar installations
Spec. 1-43 Trenching for underground cables
Spec. 1-44 URD layouts
Spec. 1-45 Subdivision staking requirements for all Tampa Electric equipment in easements
Spec. 1-46 Staking requirements for apartments and zero lot line applications
Spec. 1-47 Site preparation, three-phase pad-mount transformer installation
Spec. 1-48 Site preparation, single-phase pad-mount transformer installation
Spec. 6-1 Poured in place concrete pullbox and handhole design
Spec. 6-2 "S" Type precast manhole 8' X 12' X 7' (1 of 2)
Spec. 6-2 "S" Type precast manhole 8' X 12' X 7' (2 of 2)
Spec. 6-3 Precast 5' X 10' - 6" X 7' concrete pullbox/splicebox (1 of 2)
Spec. 6-3 Precast 5' X 10' - 6" X 7' concrete pullbox/splicebox and accessories (2 of 2)
Spec. 6-4 Precast 6' X 12' X 7' concrete pullbox/splicebox (1 of 2)
Spec. 6-4 Precast 6' X 12' X 7' concrete pullbox/splicebox and accessories (2 of 2)
Spec. 6-5 Precast 4' - 4" X 13' - 4" X 6' - 0" concrete pullbox/splicebox (1 of 2)
Spec. 6-5 Precast 4' - 4" X 13' - 4" X 6' - 0" concrete pullbox/splicebox and accessories (2 of 2)
Spec. 6-7 Polymer concrete pullbox 30" X 60" X 48"
Spec. 6-8 Precast 10' - 0" X 8' - 6" X 7'- 0" T-type manhole
Spec. 6-9 Precast manhole 10' X 10' X 7' (1 of 2)
Spec. 6-9 Precast manhole 10' X 10' X 7' (2 of 2)
Spec. 6-11 Pad design for single-phase pad-mounted transformers
Spec. 6-12 Pad design for three-phase pad-mounted transformers
Spec. 6-18 Conduit/pad details - 600 AMP - P.S.E multi-compartment gang-operated
Spec. 6-20 Pad detail for pad-mounted secondary termination cabinet
Spec. 6-21 Splicebox/light traffic handhole 30" X 48" X 18"
Spec. 7-16 Conduit detail for three-phase pad-mounted transformer
Spec. 11-2 Secondary connectors single-phase URD pad-mount transformer
Spec. 12-26 Pad-mounted secondary cabinet (1 of 3)
Spec. 12-26 Pad-mounted secondary cabinet (2 of 3)
Spec. 12-26 Pad-mounted secondary cabinet (3 of 3)
Spec. 13-17 Minimum space requirements for flammable liquid filled pad-mounted transformer in indoor vault
Spec. 13-21 Minimum space requirements for 600 AMP auto-throwover pad-mounted switching equipment (PSE) on grade indoor vault (1 of 2)
Spec. 13-21 Minimum space requirements for 600 AMP auto-throwover pad-mounted switching equipment (PSE) on grade indoor vault (2 of 2)
Spec. 13-23 Typical pit and conduit detail for 600 AMP manual and auto-throwover pad-mounted switching equipment vault (1 of 3)
Spec. 13-23 Typical pit and conduit detail for 600 AMP manual and auto-throwover pad-mounted switching equipment vault (2 of 3)
Spec. 13-23 Typical frame & cover details 600 AMP manual and auto-throwover pit area (3 of 3)
Spec. 13-25 Typical space and installation requirements for metering cabinets
Spec. 13-27 Vault space requirements for metal enclosed switchgear
Spec. 13-29 Typical conduit details pad-mount transformer in indoor vault
Instrument Transformer Rated Meter Sockets (approved list for use in Tampa Electric Service areas only)
Approved Metering Equipment Enclosure List (approved for use in Tampa Electric Company, Florida Power & Light and Progress Energy Company service areas)