Demolition Request - Please allow:

  • Up to 15 business days for inspecting and removing Tampa Electric-owned single-phase equipment accessible with a bucket truck.
  • 6 to 8 weeks for requests not accessible with a bucket truck, involving three-phase equipment, underground service or current transformers (CTs).
    Response times may vary based on weather, request complexity and workload.

Our demolition process is designed to ensure everyone's safety. To carry out the demolition process, please follow the steps below:

  • Complete Tampa Electric's Demolition Application 
  • Obtain and submit your city or county's completed Demolition Permit Application, available at the locations listed below.
    • If a sign-off sheet is required, please submit it along with the demolition application.

To help avoid delays, please:

  • Verify with the other parties you are working with (governmental agencies, homeowners, contractors, etc.) that a demolition request has not already been submitted.
  • Complete a site visit to verify the meter number and/or grid-pole number on each pole that will be removed (a grid-pole number can be found on a metal tag attached to the electric pole).
  • Have the customer of record contact Tampa Electric and close any active accounts.

Once Tampa Electric receives your applications and sign-off sheet, we will email you a confirmation of receipt. Once demolition is complete, after meters and service lines have been removed, the completed sign-off sheet and confirmation letter will be sent to the customer/contractor.

You can obtain a demolition permit application and sign-off sheet, if applicable, at the following locations:

City of Tampa

Download the city of Tampa demolition permit application and sign-off sheet – select documents and forms
813-274-3100 – select option 1

City of Temple Terrace

A demolition permit application must be obtained in person at the permitting office.
11250 N. 56th St., Temple Terrace, FL 33617
813-506-6420

City of Winter Haven

Download the city of Winter Haven demolition permit application
863-291-5695

Hillsborough County

Download Hillsborough County demolition permit application - search Apply for a Demolition Permit
813-272-5900

Pasco County

A demolition permit application must be obtained at any of the following offices:

Residential:

Dade City Central Permitting
14236 6th St., Suite 203
Dade City, FL 33523
352-521-4279

Land O Lakes Central Permitting
4111 Land O Lakes Blvd., Suite 205
Land O Lakes, FL 34639
813-929-2749

New Port Richey Central Permitting
8731 Citizens Dr., Suite 230
New Port Richey, FL 34654
727-847-8126

Commercial:

New Port Richey Central Permitting
8731 Citizens Dr., Suite 230
New Port Richey, FL 34654
727-847-8126

Pinellas County

A demolition permit application must be obtained in person at the permitting/building services office.
440 Court St., 3rd floor, Clearwater, FL 33756
727-464-3888

Polk County

Although Polk County does not require a demolition permit application for demolition processes as of May 2005, Customers must still complete Tampa Electric's demolition application (see link above).

City of Plant City

Download the city of Plant City demolition permit application.
813-659-4200

Call before you dig

Every digging project, no matter how large or small, requires a call to 811View the color code for marking underground utility lines.

Call before you dig block

Questions about your construction project?

Call Tampa Electric Construction Support at 813-635-1500.

Pay Construction Costs

Payment can be made online, by check or money order to:
Please submit to:
Tampa Electric
c/o ED Billing
PO Box 173169
Tampa, FL 33672